๐Ÿ‘‹ You're exploring a live Store Console demo โ€” nothing here is real data

Maintenance, PLM & Costing

Maintenance (CMMS)

Preventive plans trigger two ways:

  • Calendar โ€” every N days; the daily scheduler opens preventive work orders when due.
  • Meter-based โ€” every N runtime hours / cycles / units produced. Record meter readings from the Maintenance page; crossing the service threshold opens the work order automatically, and completing it re-arms the trigger from the latest reading.

Corrective work orders link directly to downtime events from the shop floor, and parts cost is captured on completion.

PLM โ€” engineering changes

PLM manages ECOs through draft โ†’ in-review โ†’ approved โ†’ implemented (approvals flow through Momentum). Each ECO carries a document vault:

  • Upload CAD, STEP, drawings and specs (revision-tracked).
  • Preview images, PDFs and text inline.
  • Open 3D models right in the browser โ€” STL, OBJ, GLB/GLTF and STEP/STP render in an interactive viewer (orbit, zoom, pan). STEP parsing loads on demand, so the page stays fast.

Implementing an ECO can publish a new BOM version in the same step.

Costing

Choose FIFO, weighted-average or standard costing per item. Completing a production order captures actual material, labor and overhead cost, computes variance against the standard, writes the variance ledger and posts journals to Accounting โ€” including the inversion entries when output is reversed.

Money flow at a glance

Issue materials  โ†’ WIP debit (at the item's costing method)
Record labor     โ†’ labor cost capture (rates per work center)
Complete order   โ†’ finished goods at actual cost
                 โ†’ variance vs standard โ†’ variance ledger
                 โ†’ GL journals posted to Accounting
Last updated: 9/15/2026