Planning: MRP, Forecasting, Scheduling & ATP

Multi-level MRP netting

Planned Orders โ†’ Run MRP Netting explodes pending demand level by level through the BOM. At every level the gross requirement is netted against:

  • on-hand stock at the node, and
  • scheduled receipts (open production orders for that item).

Only the net shortfall becomes a planned order, with due dates offset one lead time earlier per BOM level. The run report shows gross / on-hand / receipts / net per item per level.

Demand 100 FG          (on hand 30)  โ†’ net 70 FG planned
  โ””โ”€ needs 140 SUB     (on hand 20)  โ†’ net 120 SUB planned
       โ””โ”€ needs 360 RAW (on hand 0)  โ†’ net 360 RAW planned

The CLI equivalent is php artisan mfg:mrp-net.

Forecasting

Forecast combines a statistical baseline (moving average + trend) with optional AI adjustment, tracks forecast accuracy (MAPE), and feeds demand planning.

APS โ€” the capacity board

Schedule shows a 14-day board: work centers ร— days, cells coloured by load. Two ways to fill it:

  • Run โ€” greedy earliest-due-first packing (fast, predictable).
  • Optimize โ€” simulates several dispatch sequences (earliest-due, shortest-processing, critical-ratio), balances flexible work onto the least-loaded work center and runs a late-order local search; the lowest-cost plan wins. The toast tells you which strategy won.

Drag any order chip to a different day or work center to override the machine โ€” overloads raise a live alert (and a Momentum work item).

Global ATP

On Inter-Plant Transfers, the Global ATP card answers "can we promise N units of X?" across every plant: on-hand + scheduled receipts โˆ’ committed demand, per plant and network-wide, with the earliest promise date.