👋 You're exploring a live Store Console demo — nothing here is real data

Memulai: Order Produksi Pertama Anda

Lima belas menit dari modul kosong hingga order produksi selesai.

1. Siapkan pabrik (sekali)

Step 1  Admin → Manufacturing → Work Centers
        Create one work center per line/cell. Set daily capacity minutes.

Step 2  Admin → Manufacturing → BOMs
        Create a BOM for a product you make: output item + component lines.
        Publish a version (effective from today).

Step 3  (Optional) Routings
        Add operation steps with setup/run times per work center —
        the scheduler uses them; unrouted items still schedule fine.

Step 4  (Optional) Industry preset
        Pick a preset (food, pharma, electronics…) to auto-activate
        the compliance features your industry expects.

2. Jalankan alur harian

Demand arrives (order, forecast or manual signal)
   ↓
Planned order proposed (MRP)   →  firm it when you agree
   ↓
Production order created       →  release to the floor
   ↓
Issue materials from stock     →  WIP tracked automatically
   ↓
Record output (good/graded/by-products)
   ↓
Quality inspection (if the item's policy requires it)
   ↓
Complete the order             →  finished goods enter inventory,
                                  actual costs post to Accounting

Setiap langkah memicu event langsung—dan dashboard diperbarui secara real time bagi semua orang yangantau.

3. Pintasan untuk toko kecil

Lewati perencanaan sepenuhnya: Order Produksi → Baru, pilih BOM, jumlah, dan tanggal jatuh tempo. Semua hal lainnya (perencanaan, penjadwalan, peramalan) dapat dinonaktifkan hingga Anda membutuhkannya.

Terakhir diperbarui: 11/21/2026