👋 You're exploring a live Store Console demo — nothing here is real data

Kom i gang: Din første produksjonsordre

Fra tomt modul til en fullført produksjonsordre på femten minutter.

1. Sett opp fabrikken (én gang)

Step 1  Admin → Manufacturing → Work Centers
        Create one work center per line/cell. Set daily capacity minutes.

Step 2  Admin → Manufacturing → BOMs
        Create a BOM for a product you make: output item + component lines.
        Publish a version (effective from today).

Step 3  (Optional) Routings
        Add operation steps with setup/run times per work center —
        the scheduler uses them; unrouted items still schedule fine.

Step 4  (Optional) Industry preset
        Pick a preset (food, pharma, electronics…) to auto-activate
        the compliance features your industry expects.

2. Kjør den daglige flyten

Demand arrives (order, forecast or manual signal)
   ↓
Planned order proposed (MRP)   →  firm it when you agree
   ↓
Production order created       →  release to the floor
   ↓
Issue materials from stock     →  WIP tracked automatically
   ↓
Record output (good/graded/by-products)
   ↓
Quality inspection (if the item's policy requires it)
   ↓
Complete the order             →  finished goods enter inventory,
                                  actual costs post to Accounting

Hvert trinn utløser live-hendelser — dashboarder og tavler oppdateres i sanntid for alle som følger med.

3. Snarvei for småbutikker

Hopp over planleggingen helt: Produksjonsordrer → Nytt, og velg BOM, antall og forfallsdato. Alt annet (planlegging, timeplanlegging og prognostisering) kan være avslått til du trenger det.

Sist oppdatert: 11/21/2026