Başlarken: İlk Üretim Emriniz
Boş bir modülden tamamlanmış üretim emrine 15 dakika.
1. Fabrikayı kurun (bir kez)
Step 1 Admin → Manufacturing → Work Centers
Create one work center per line/cell. Set daily capacity minutes.
Step 2 Admin → Manufacturing → BOMs
Create a BOM for a product you make: output item + component lines.
Publish a version (effective from today).
Step 3 (Optional) Routings
Add operation steps with setup/run times per work center —
the scheduler uses them; unrouted items still schedule fine.
Step 4 (Optional) Industry preset
Pick a preset (food, pharma, electronics…) to auto-activate
the compliance features your industry expects.
2. Günlük iş akışını yürütün
Demand arrives (order, forecast or manual signal)
↓
Planned order proposed (MRP) → firm it when you agree
↓
Production order created → release to the floor
↓
Issue materials from stock → WIP tracked automatically
↓
Record output (good/graded/by-products)
↓
Quality inspection (if the item's policy requires it)
↓
Complete the order → finished goods enter inventory,
actual costs post to Accounting
Her adım gerçek zamanlı olayları tetikler — panolar ve paneller, izleyen herkes için anında güncellenir.
3. Küçük işletme kısayolu
Planlamayı tamamen atlayın: Üretim Emirleri → Yeni, BOM, miktar ve termin tarihini seçin. Diğer tüm işlemler (planlama, programlama, tahmin) ihtiyaç duyulana kadar devre dışı bırakılabilir.