👋 You're exploring a live Store Console demo — nothing here is real data

Başlarken: İlk Üretim Emriniz

Boş bir modülden tamamlanmış üretim emrine 15 dakika.

1. Fabrikayı kurun (bir kez)

Step 1  Admin → Manufacturing → Work Centers
        Create one work center per line/cell. Set daily capacity minutes.

Step 2  Admin → Manufacturing → BOMs
        Create a BOM for a product you make: output item + component lines.
        Publish a version (effective from today).

Step 3  (Optional) Routings
        Add operation steps with setup/run times per work center —
        the scheduler uses them; unrouted items still schedule fine.

Step 4  (Optional) Industry preset
        Pick a preset (food, pharma, electronics…) to auto-activate
        the compliance features your industry expects.

2. Günlük iş akışını yürütün

Demand arrives (order, forecast or manual signal)
   ↓
Planned order proposed (MRP)   →  firm it when you agree
   ↓
Production order created       →  release to the floor
   ↓
Issue materials from stock     →  WIP tracked automatically
   ↓
Record output (good/graded/by-products)
   ↓
Quality inspection (if the item's policy requires it)
   ↓
Complete the order             →  finished goods enter inventory,
                                  actual costs post to Accounting

Her adım gerçek zamanlı olayları tetikler — panolar ve paneller, izleyen herkes için anında güncellenir.

3. Küçük işletme kısayolu

Planlamayı tamamen atlayın: Üretim Emirleri → Yeni, BOM, miktar ve termin tarihini seçin. Diğer tüm işlemler (planlama, programlama, tahmin) ihtiyaç duyulana kadar devre dışı bırakılabilir.

Son güncelleme: 11/21/2026